Full Monte for Microsoft Project.
(Scroll Down for Full Monte for P6)
Click here for the latest Full Monte for Microsoft Project Release Note
Full Monte SRA for Microsoft Project: 3.7.24313.3 (Released November 2024) Bug Fix and Legal Update
Updated the Company and Copyright information to reflect the acuisition of Barbecana by Intra Management Software & Technolgies Inc. Fixed an issue where bar colors shown on the screen were not printed correctly. Added support for duration units on Discrete Risk duration impacts. Fixed an issue that prevented Discrete Risks containing an apostrophe in the description from importing correctly.
Full Monte SRA for Microsoft Project: 3.7.24220.1 (Released August 2024) Bug Fix
Fixed some issues with Risk Register Import and corrected Risk Import Help text. Added a log message when Task Constraint type was improperly defined in Project.
Full Monte SRA for Microsoft Project: 3.7.24173.2 (Released June 2024) Feature update and Bug Fix
Made a change so that Input Milestones can be included in Tornado Sensitivity reports. Fixed an issue where a crash could occur while editing risks if a risk was defined with no assigned tasks. Fixed an issue where, for a clean install, the date format of the task edit view would be undefined.
Full Monte SRA for Microsoft Project; 3.7.24164.2 (Released June 2024) Feature Release
New Risk Register and Risk Plan creation features, Options dialog, and View Enhancements. Important Note: This release requires a new license key. If you are updating from an earlier version please ensure you request a new license key from your IT Department or Barbecana before updating to 3.7.
Full Monte SRA for Microsoft project: 3.6.24057.1 (Released February 2024) Feature Update
Released two new FullMonteUserConfiguration.txt options to manage the use of Enterprise Fields. SUPPRESSENTERPRISEFIELDS=TRUE will prevent Enterprise fields from being displayed in Field Pick Lists (but appropriate fields will still be automatically mapped) and DISABLEENTERPRISEFIELDS=TRUE that will disable the use of Enterprise fields entirely including removing them from Field Mappings. Also added a new option SUPPRESSFRIENDLYFIELDNAMES=TRUE to reduce clutter in field pick lists by only including the original field name.
Full Monte SRA for Microsoft Project: 3.6.24019.1 (Released January 2024) Bug Fix
Fixed an issue where a comma in the users documents folder file path would cause Full Monte to crash on startup. This could happen if the users documents were re-directed to a cloud storage environment.
Full Monte SRA for Microsoft Project: 3.6.23333.x (released December 2023) Bug Fix
Fixed an issue where the dropdown list of distribution types on the Manage Template dialog included a ‘Discrete’ option that was not valid.
Fixed a crash in the JCL report introduced when we added the risk analysis Converegnec feature.
Full Monte SRA for Microsoft Project: 3.6.23293.x (released October 2023) Minor Update and Bug Fix
Added an option (USEAPPDATA=TRUE) to FullMonteSystemConfiguration.txt to save Full Monte user files under C:\Users\<username>\AppData. This is useful where the users Documenst folder is inaccessible. Fixed a bug where Finish dates saved back to linked projects could be adjusted to a working period in the Master project Standard Calendar rather than the Standard calendar of the linked project. Calculations were not affected by the issue.
Full Monte SRA for Microsoft Project: 3.6.23237.x (released August 2023) Feature Update
Added an option to display Convergence information after a Risk Analysis is performed. Fixed an issue when changing an existing Task to a Milestone when the task had conditional branching information. Fixed an issue where Risk Path numbering could loop and cause an out of memory condition. Improved tool tips for Foreign Tasks and their Predecessor/Successor tasks.
Full Monte SRA for Microsoft Project: 3.6.23164.x (released June 2023) Feature Update
Added two new FullMonteUserConfiguration.txt options to simplify using Full Monte with Microsoft Project master projects with inserted external subprojects. The new options allow field mappings to be automatically applied to those external subprojects.
Full Monte SRA for Microsoft Project: 3.6.23152.x (released May 2023) Bug fix
Fixed a crash when assigning User default Field Mappings to a new project where there was a conflict with existing data and the mappings included a Full Monte input field (like LOE or Schedule Margin flags).
Added a new FullMonteUserSettings.txt option (HONORLEVELINGDELAY=TRUE) to respect leveling delays set in Microsoft Project.
Full Monte SRA for Microsoft Project: 3.6.23108.x (released April 2023) Bug fix
Fixed a crash when creating export definitions if no other settings had ever been modified.
Improved import/expot dialog to remember last used configuration after clicking Save.
Full Monte SRA for Microsoft Project: 3.6.23103.x (released April 2023) Minor Feature Update
Significantly improved the performance of File, Export for large schedules.
Full Monte now saves the manual X-Axis settings separately for the various graph types (Date, Cost etc.)
Improved support for ‘Split’ tasks by calculating a ‘span’ duration encompassing all splits and using this in the simulation.
Improved the algorithm for the manual X-Axis scale marking on graphs.
Added a new FUllMonteUserConfiguration.txt option (USENEWXAXISSCALE=TRUE) to allow the user to also use the new scaling algorithm for auto-scaled graphs.
Full Monte SRA for Microsoft Project: 3.6.23069.1 (released March 2023) Feature Update
Added support for assigning templates from custom Number fields. Added user options to reduce clutter in field pick lists and improved performance with Project Enterprise Fields. Read the Relase Note.
Full Monte SRA for Microsoft Project: 3.6.23025.1 (released January 2023) Bug Fix
Fixed an issue where Full Monte could incorrectly prompt to Save Mappings after Field Mappings were updated.
Full Monte SRA for Microsoft Project: 3.6.23011.2 (released January 2023) Bug Fix
Fixed an issue where risk cost impact values could not be saved if the Microsoft Project currency setting was different to the Windows regional currency setting. The Microsoft Project currency symbol is now used for all validation.
Full Monte SRA for Microsoft Project: 3.6.22346.2 (released December, 2022) Bug fix
Fixed an issue with discrete risks caused by project names with no file extension.
Full Monte SRA for Microsoft Project: 3.6.22336.2 (released December, 2022) Deployment Update
Formally released new deployment configuration options.
Full Monte SRA for Microsoft Project: 3.6.22328.1 (released November, 2022) Feature Release
Added support for Duration and Cost Impact for discrete risks. Enhanced Import/Export to support multiple named definitions and allow input milestone date imports. Added system configuration options to support enterprise deployments along with other usability enhancements. Release Note
Full Monte SRA for Microsoft Project: 3.5.22165.1 (released June, 2022) Bug Fix
Fixed an issue where Importing duration uncertainty could fail for Normal Distributions.
Full Monte SRA for Microsoft Project: 3.5.22081.1 (released March, 2022) Feature Update
Added the ability to highlight specific percentiles on Histogram S-curves.
Full Monte SRA for Microsoft Project: 3.5.21229.1 (released August 17, 2021) Usability and Installation Update
Added a log file warning if imported Most Likely durations do not match Remaining Duration. Added additional diagnostic messages when opening projects. Added a Schedule Margin Flag so that Schedule Margin Tasks can now be automatically set to a zero probability of occurrence. Reduced the time taken for most risk analysis by about 20% and reduced the likelihood of an out-of-memory condition. Added some additional .Net 4.0 files to the distribution to avoid issues with non-standard Windows 10 .Net 4.0 feature installations.
Full Monte SRA for Microsoft Project: 3.5.21058.1 (released March 1, 2021) Usability and Bug Fix Update
The major change in Full Monte 3.5 is a new installation process to better support corporate deployments along with enhancements to Project Server and Project Online Enterprise Fields. Bug fixes include better support for 4K monitors and resolving an exception that could occur after tasks were promoted to summary tasks. Click here to view the release notes.
Full Monte SRA for Microsoft Project: 3.4.20338.x (released December 5,2020) Minor Feature Update
Full Monte now trims (removes leading and trailing spaces) from template names assigned to a custom text field in Microsoft Project to avoid errors when assigning templates.
Full Monte SRA for Microsoft Project: 3.4.20321.x (released Nov 16,2020) Bug Fix and Usability update.
Fixed an issue when saving discrete risks assigned to tasks, added a registry option to revert Inactive task handing to treat inactive tasks as active, fixed an issue where saving integer results set to NA in Full Monte would cause an exception with Project Enterprise Fields, improved the warning related to invalid template names found in Text/Activity Code values to include the invalid value.
Full Monte SRA for Microsoft Project: 3.4.20289.x (released Oct 15, 2020) Usability update.
Added improved exception diagnostic information when saving Enterprise custom fields and reading Resource rates (Currencies).
Full Monte SRA for Microsoft Project: 3.4.20275.x (released Oct 1,2020) Bug Fix and Usability update.
Bug Fixes for Tornado split bars, View size saving, European decimal separators. Minor enhancements for Tornado bar headers, Manually scheduled tasks.
Full Monte SRA for Microsoft Project: 3.4.20162.1 (released June 2020) Feature Update.
Click here to view the Full Monte 3.4 for Microsoft Project Release Note
Full Monte SRA for Microsoft Project: 3.3.20098.4 (released April 2020) Bug Fix Release.
Name Change to Full Monte SRA, File Export converts percentages to durations, fixed crash in Filter Dialog.
Full Monte 2017 R2 for Microsoft Project: 3.3.19249.3 (released September 2019) Bug Fix Release.
Autoscale History view X-Axis, fixed a problem where costs had manual profiles and cost escalation, updated code signing certificate.
Full Monte 2017 R2 for Microsoft Project: 3.3.19158.1 (released June 2019) Bug Fix Release.
Bugs fixed in this release include Probabilistic Branching, Foreign Language Support, and Edit Pane Sizing.
Full Monte 2017 R2 for Microsoft Project: 3.3.19123.2 (released May 2019) Feature Update.
Click here to view the Full Monte 3.3 Release Note
Full Monte 2017 R1 for Microsoft Project: 3.2.19036.1 (released February 2019) – Bug Fix Release.
Full Monte 2017 R1 for Microsoft Project: 3.2.18155.1 (released June 2018) – Feature Update.
Click here to view the Full Monte 3.2 Release Note
Full Monte 2017 for Microsoft Project: 3.1.18122.2 (released May 2018) – Bug Fix Release.
Full Monte 2017 for Microsoft Project: 3.1.17097.3 (released April 2017) – Feature Update.
Click here to view the Full Monte 3.1 Release Note
Full Monte 2016 for Microsoft Project: 3.0.16054.2 (released February 2016) – Bug Fix Release.
Full Monte 2016 for Microsoft Project: 3.0.15341.1 (released December 2015) – Major Release.
Full Monte 2.1 for Microsoft Project: 2.1.15317.1 (released November 2015) – Bug Fix Release – End of Life.
Continued access to support and upgrades after the first 12 months can be purchased annually for:
Full Monte SRA for Microsoft Project: $179 per year.
Full Monte for Primavera P6
Click here for the Full Monte for P6 Release Note
Full Monte SRA for Primavera P6: 3.7.24313.1 (Released November 2024) Bug Fix and Legal Update
Updated the Company and Copyright information to reflect the acuisition of Barbecana by Intra Management Software & Technolgies Inc. Fixed an issue where bar colors shown on the screen were not printed correctly. Added support for duration units on Discrete Risk duration impacts. Fixed an issue that prevented Discrete Risks containing an apostrophe in the description from importing correctly.
Full Monte SRA for Primavera P6: 3.7.24288.4 (October 2024) Bug Fix
Gantt Bars now print in the color shown on screen. Discrete Risk Duration Impacts can now be entered with any valid duration units. Discrete Risks with Apostrophes in either the Risk Name or Description are now saved correctly.
Full Monte SRA for Primavera P6: 3.7.24164.x (June 2024) Feature Release
Support for Analysis Focus Items. New Go to… option on the right-click context menu to make logic tracing easier. Enhanced view highlight options, improved distribution type information displayed for milestones. More concistent highlighting of selected row editable columns. Added parent project to WBS field.
Full Monte SRA for Primavera P6: 3.6.24080.1 (March 2024) Minor Update
Full Monte now saves database connection information in a format that supports customer who have commas in file path names.
Changed the default save behavior to no longer save old style Full Monte reulst in P6 memo fields.
Added suppor for Microsoft SQL Server database in the Full Monte SRA Contractor Edition.
Resolved cosmetic several issues with the New Connection dialog.
Full Monte SRA for Primavera P6: 3.6.23362.x (December 2023) Minor Update
Fixed a bug that prevented P6 Codes being displayed in Full Monte columns.
Added ‘ New’ button to the Connection Configuration dialog to simplify new connections.
Full Monte SRA for Primavera P6: 3.6.23279.x (October 6 2023) New Configuration Options
Added options to reduce save time and ignore Full Monte passwords for SQL Server and Oracle users.
Full Monte SRA for Primavera P6: 3.6.23209.1 (Released July 28 2023) Performance
Modified Full Monte to load project WBS structures ‘on demand’ to reduce the time taken to open individual projects and reduce memory consumption where customers have large WBS structures on many projects. Fixed an issue where Input Milestone Uncertainty was not read from previously saved data correctly. Improved the display of ‘foreign’ activity information and their predecessors/successors.
Full Monte SRA for Primavera P6: 3.6.23170.1 (Released June 2023) Bug Fix
Fixed an issue where Input Milestone Uncertainty dates were not loaded from the database when projects were opened in Full Monte.
Full Monte SRA for Primavera P6: 3.6.23135.1 (released May 2023) Minor Feature Update
Full Monte for P6 now supports an ‘import’ to load activity and milestone uncertanty data and discrete risks from P6 user defined fields. Also added a simple import for discrete risks from a CSV file. Added a new FullMonteUserConfiguration.txt option (SUPPRESSSAVINGP6RESULTS=TRUE) to suppress saving of results to P6 fields (i.e. Histogram result data).
Full Monte SRA for Primavera P6: 3.6.23104.1 (released April 2023) Minor Feature Update
Full Monte now saves the manual X-Axis settings separately for the various graph types (Date, Cost etc.)
Improved the algorithm for the manual X-Axis scale marking on graphs.
Added a new FullMonteUserConfiguration.txt option (USENEWXAXISSCALE=TRUE) to allow the user to also use the new scaling algorithm for auto-scaled graphs.
Full Monte SRA for Primavera P6: 3.6.23069.1 (released March 2023) Minor feature Update
Added a new FullMonteUserConfiguration.txt option (SIMPLIFYGRAPHTITLE=TRUE) to simplify the graph title area by omitting Mean and Standard Deviation.
Slightly reduced the gap between graph X-Axis markers.
Full Monte SRA for Primavera P6: 3.6.22349.1 (released November 2022) Feature Update
Duration and Cost impact can now be specified for discrete risks.
Added a new option to graph views to ‘Copy to CSV’. This saves the histogram data (X-Axis intervale and Y Axis Percentage Hits) to a CSV file for use with Excel.
Added a new configuration file to allow users to modify some product behavior.
Added a new button to the menu to give direct access to the Tornado Sensitivity view.
Full Monte SRA for Primavera P6: 3.5.22061.1 (released March 2022) Bug Fix and Feature Update
Fixed an issue where assigning uncertainty from a P6 Activity Code could fail if a WBS ID happened to match an Activity ID. Enhanced the SQL Log to include details of returned data rows. Added the ability to highlight specific percentiles on Histogram S-curves.
Full Monte SRA for Primavera P6: 3.5.22021.1 (released January 2022) Feature Update
Made the handling of Mandatory Constraints an option on the Risk Analysis dialog.
Full Monte SRA for Primavera P6: 3.5.21308.1 (released November 2021) Bug Fix
Fixed an issue if you attempted to create a new database connection in a new install without opening an existing database connection first.
Full Monte SRA for Primavera P6: 3.5.21293.1 (released October 2021) Regulatory
Updated code signing certificate.
Full Monte SRA for Primavera P6: 3.5.21217.1 (released August 2021) Version Update
Introduced Contracter Edition licenses and simplified user management for SQLite databases.
Full Monte SRA for Primavera P6: 3.4.20272.3 (released September 2020) Feature Update
Click here to view the Full Monte 3.4 for Primavera P6 Release Note
Full Monte SRA for Primavera P6: 1.4.20097.1 (released April 2020)
Full Monte 2017 R2 for Primavera: 1.4.19249.1 (released September 2019) Bug Fix.
Fixed a problem with interpretting P6 Lags with Out-of-Sequence progress.
Autoscale History view X-Axis, updated code signing certificate.
Full Monte 2017 R2 for P6: 1.4.19158.1 (released June 2019) Bug Fix Release.
Bugs fixed in this release include Probabilistic Branching, and Edit Pane Sizing.
Full Monte 2017 R2 for P6: 1.4.19123.1 (released May 2019) Feature Update. Please see the Release Note.
Full Monte 2017 for P6: 1.3.18068.1 (released March 2018) – Feature Update. (Supported P6 6.2 – 15.x)
Full Monte 2016 for P6: 1.2.16057.3 (released March 2016) – Feature Update.
Technical Support is FREE for the first 12 months after purchase.
Full Monte Contractor edition includes lifetime free updates.
If you have any questions regarding download, installation, or using Full Monte, please contact support.